ADOT touts size of freeway bridge girders over Salt River

ADOT

ADOTAhwatukee Foothills News

The Arizona Department of Transportation is touting another distinctive feature of the South Mountain Freeway.

“Already the largest single highway project in Arizona history,” ADOT said in a release last week, it “now has the longest bridge girders of their type in the state.”

The agency said it has installed 94 “extra-long” single-span girders on two bridges going in both directions over the Salt River.

Characterizing the girders as being “as long as a 17-story building and each weighing as much as 14 elephants,” ADOT said each girder weighs 169,000 pounds and extends 17 feet.

READ ON:

Share this!

Additional Articles

News Categories

Get Our Twice Weekly Newsletter!

* indicates required

Rose Law Group pc values “outrageous client service.” We pride ourselves on hyper-responsiveness to our clients’ needs and an extraordinary record of success in achieving our clients’ goals. We know we get results and our list of outstanding clients speaks to the quality of our work.

PRTA suspends operations

(Disclosure: Rose Law Group represents a coalition of property and business owners throughout Pinal County who have worked to bring new transportation infrastructure to the

Read More »
September 2017
M T W T F S S
 123
45678910
11121314151617
18192021222324
252627282930