By Adrienne St. Clair for Arizona Builder’s Exchange | AZBEX
Cives Steel Company has submitted a plan to the City of El Mirage to build a steel manufacturing facility as part of the CenterPoint Logistics Park, which as a whole consists of 317 acres at the SWC of Peoria Avenue and Dysart Road.
The new manufacturing facility, which will be a pre-fabricated metal building, is anticipated to be approximately 114KSF and will stand on 25 acres located on the NWC of Dysart Road and Olive Avenue. The project is planned to be built in three separate phases and is valued between $8M and $15M.
The site’s current zoning designation is El Employment Industry/Agricultural. The developer is requesting a slight change, going from agricultural to industrial. The surrounding property is zoned as both El Employment Industry/Agricultural and AD-3 (Maricopa County)/Agricultural. Approval from both the city’s Planning and Zoning Commission Board and the City Council is required because of the size and scale of the project. Additionally, each of the three phases will require a separate plan review from the city.