AZRE | AZBigMedia
The Southwest Division of Graycor Construction Company has been selected as the general contractor for Phase I of Glendale 303 (G303), a Class A industrial development that, at build-out, will total up to 1.2 million square feet along the booming Loop 303 corridor in Glendale, Arizona.
G303 is being developed by international real estate firm Hines and funds managed by Oaktree Capital Management LP (Oaktree). The industrial park will be constructed in two phases, with two buildings each totaling 569,520 square feet. To meet the space needs of a major tenant, G303 has the flexibility to transform into a single, 1.2 million-square-foot building.
As the Phase I general contractor, Graycor will manage grading for the full project site and build G303’s first 569,520-square-foot building. The company will begin construction for Phase I on time this July, and complete during the first quarter of 2021.